Residential Demolition Services
From a full tear-down on an infill lot to one cracked brick chimney, we plan residential demolition around the permit, the neighbors and what you intend to build next. Every job starts with surveys and ends with a clean, graded site.
Residential demolition is any removal work on a property where people live, and the scope ranges from an entire structure down to a single element. The largest jobs are house demolition, where a home comes down so the lot can be rebuilt, and partial home demolition, where one wing, a second story or a rear addition is removed while the rest of the house stays standing. Fire-damaged home demolition is its own category, because the debris, the insurance file and the safety concerns differ from a planned tear-down.
Smaller scopes are just as common. Garage demolition often clears room for an accessory dwelling unit. Shed and outbuilding removal takes out workshops, greenhouses, carports and old studios. Deck and patio cover demolition handles rotted wood decks, aluminum covers and pergolas. Swimming pool removal breaks out a shell and backfills the hole. Mobile home demolition covers manufactured homes on private land and in parks, and chimney removal takes down masonry chimneys that are cracked, leaning or in the way of a remodel.

The house itself shapes the method. A pre-war bungalow or Victorian in Oakland, Berkeley or San Francisco usually has a raised wood floor over a perimeter foundation, old-growth framing, plaster on lath and several coats of lead paint, so it gets a careful interior strip before the frame is pulled. A 1950s ranch home in a Santa Clara County tract sits on a slab or a shallow crawlspace and comes apart quickly once the roof is off. Eichlers are a special case: post-and-beam framing over a slab with radiant heating tubes cast inside, so the slab is heavier work than the house.
Hillside homes in the Oakland hills, Marin and the Peninsula ridges add retaining walls, stepped foundations and decks on tall posts, and the only way in may be a narrow, winding street. Properties in Sonoma and Napa counties can include barns, well houses and septic systems alongside the main residence. During the site visit we look at the house type, the lot and the street together, because those three things decide which machine fits and how much of the job is done by hand.
Most whole-house jobs run on a mid-size excavator fitted with a hydraulic thumb. The thumb lets the operator pick framing apart, separate wood from metal and load trucks without a second machine. On infill lots and backyards the same work scales down to a mini excavator, with a compact track loader moving debris to the street. Concrete is broken with a hydraulic breaker, and anything near a structure that stays is saw-cut first so the breaker does not crack it.
Hand demolition is still part of almost every residential job. It is how an attached garage is separated from the house wall that remains, how a chimney comes down without punching through the roof, and how doors, fixtures and hardwood are salvaged before the machine arrives.
Order matters more than speed. Before anything is torn down, a certified asbestos consultant surveys the building and painted surfaces are checked for lead. Anything that must come out first is removed by a state-certified abatement contractor we schedule. Utilities are then shut off: PG&E pulls the gas meter and electric drop (Silicon Valley Power, Palo Alto Utilities or Alameda Municipal Power handle electric where they serve), water is closed at the meter, and the sewer lateral capped and inspected where the city requires it.
With the permit issued and erosion control in place (fiber rolls, storm drain inlet protection and a stabilized entrance for trucks), the structure comes down in an order that keeps debris inside the lot. Material is sorted as it is loaded. Foundations and flatwork are broken out last, voids are backfilled and compacted, and the pad is rough graded so the next contractor starts on a level, clean site.
Residential Demolition
House DemolitionComplete house tear-downs from survey and permit through capped utilities, sorted demolition, foundation removal and rough grading, ready for a new home or ADU.
Garage DemolitionDetached and attached garage demolition with slab and driveway removal, power and gas shutoffs, hazard checks and a clean pad ready for an ADU or open yard.
Shed & Outbuilding RemovalRemoval of sheds, workshops, greenhouses, carports, studios and other backyard outbuildings, including floors, pier blocks and small slabs, with debris sorted for recycling.
Deck & Patio Cover DemolitionRemoval of wood and composite decks, hillside decks, stairs, pergolas and aluminum patio covers, with ledger cleanup, footing removal and treated wood handled separately.
Swimming Pool RemovalFull and partial in-ground pool removal for gunite, concrete, fiberglass and vinyl pools, including draining, equipment removal, compacted backfill and permit closeout.
Mobile Home DemolitionDemolition of mobile and manufactured homes in parks and on private land, including skirting, decks and carports, chassis recycling, hazard checks and pad cleanup.
Fire-Damaged Home DemolitionDemolition and debris removal for homes damaged by fire, from partial removal of burned rooms to full clearing, with ash handling, hazard testing and claim documentation.
Partial Home DemolitionRemoval of rear additions, second stories, wings, porches and attached structures while the rest of the house stays standing, with shoring, cut lines and weather protection.
Chimney RemovalRemoval of brick, block and stone chimneys to below the roofline or down to the foundation, by hand and top down, with roof, attic and firebox openings closed out.
Advantage

The same team that walks your property handles utility requests, the air district notice, demolition, haul-off and rough grading, so nothing falls between two contractors.
Mini excavators and compact loaders fit through side yards and work on infill lots where full-size machines would damage fences, driveways and the neighbors' landscaping.
Lumber, scrap metal, broken concrete and yard waste each get their own pile during demolition. Clean piles mean recyclers accept the loads, and you end up with the receipts your city asks for.
Adjacent homes get written notice of the loudest work dates, and we keep the street swept and driveways clear so the project does not become a neighborhood complaint.
Nearly every Bay Area city requires a demolition permit to take down a house or garage, and many require one for a pool or a detached shed with power. Inside city limits the building division issues it; on unincorporated land the county does. Either office usually asks for utility disconnect confirmations, a site plan and the asbestos survey. Older homes may go through historic review first, and some cities want a tree protection plan when work comes near a protected oak or street tree.
BAAQMD Regulation 11 Rule 2 governs asbestos during demolition throughout the air district. It calls for the survey first and for written notice to the air district ahead of any building demolition, and a clean survey does not waive that notice. For recycling, CALGreen sets a floor of 65 percent: that share of a project's nonhazardous debris has to be reused or recycled instead of buried. Many cities collect a waste management plan, and sometimes a deposit, at permit time and ask for facility receipts before final sign-off.
We do not publish prices, because two houses of the same size can cost very different amounts to remove. The structure is only part of the picture. What sits under it, what is inside its walls and how trucks reach it often matter more than square footage.
A useful quote needs a site visit. We walk the property, look into the attic and crawlspace, measure concrete and check the street for truck staging. If the asbestos survey is already done, sharing its results lets us plan abatement coordination around real findings instead of a guess.
The physical demolition of a typical single-family house is short compared with everything around it. Permit review, the asbestos survey, any abatement and the utility disconnects take most of the calendar, and the utility step is the one owners tend to underestimate. Gas and electric service removal is scheduled by the utility, not by the demolition contractor, and a backlog on their side can hold a job even when everything else is ready.
Once work begins, the factors that stretch the schedule are concrete volume, hand work beside structures that stay, wet-season erosion control and limits on working hours. Many cities restrict noisy construction to weekday daytime hours with shorter Saturday windows, so breaker work on a residential street runs on a tighter clock than the same work in an industrial area. We give an expected schedule after the site visit and update it as permit and utility dates firm up.
Residential demolition happens a few feet from someone's bedroom window, parked car or vegetable garden. We wet material while it is being pulled and loaded so dust stays on the lot, sweep the street at the end of each day and keep trucks on a staging plan the city accepts when the street is narrow. Fencing goes up before the first day of heavy work, and neighbors get a notice listing the dates of the loudest phase, which is usually breaking the foundation.
Inside the fence, safety comes from sequence and control. Walls are pulled inward, away from property lines. Workers stay clear of the excavator's swing. Overhead lines are confirmed dead or protected before a boom goes up. Where a house sits close to the neighbor's, the nearest wall is taken down by hand or pulled in with the thumb rather than pushed outward.
Yes. Every city and county in the region requires a demolition permit for a house, and most require one for a detached garage. The building division usually wants the asbestos survey, utility disconnect confirmations and a site plan before issuing it. We prepare the demolition side of the application and coordinate with your designer if you are rebuilding.
BAAQMD Regulation 11 Rule 2 calls for the survey before demolition regardless of the home's age, and the air district is notified before work starts. Newer homes rarely contain much asbestos, but joint compound, flooring and roofing can still need testing. A certified asbestos consultant performs the survey, not the demolition crew.
Sometimes. If your engineer plans to reuse a foundation or slab, we take down the structure above it and protect what stays. More often the foundation comes out because new plans rarely line up with the old footprint. We follow whatever the approved drawings call for.
Wood, metal, concrete, asphalt and green waste are separated on site and hauled to recycling facilities, and only the remainder goes to disposal. Keeping loads clean is how a project meets the CALGreen 65 percent diversion requirement. We keep the receipts your city asks for at final.
The work plan is built to prevent it. Walls are pulled inward, concrete near property lines is saw-cut before breaking, and fences or plantings along the line are protected. Before we start, we photograph the adjacent conditions so everyone has a record.
Yes. Smaller jobs such as a pool, shed, deck or chimney can be quoted alone. If a whole-property demolition is coming, folding them into one job means the equipment mobilizes once.